<aside> <img src="/icons/snare-drum_lightgray.svg" alt="/icons/snare-drum_lightgray.svg" width="40px" />

A project is made of components, what creates the necessity to manage them effectively. Parts, tools, anything physical needs a space and planning behind it.

</aside>

A project has and will have to face challenges regarding space and parts. We can categorize physical resources as follows:

Part of project management is ensuring the project has all the necessary resources to work effectively. This includes ensuring spaces are available when needed and that critical parts or components are available with spare parts in case they break. Doing this is mostly about planning ahead. Let’s see an example of what managing parts should look like.

Physical Resources Tracking

Wiring Tracking

Department Name ID AWG Cable Mass (g) Origins Connector Origin Destinations Connector Destination Number of Cables in Project Number of Wires in Cable Wire Function Color Criticality Prob. Break Result (CR*PB) Spare Cables Needed
TR 1 TR-W1 14 23 • TR-P3
• TR-P2 JST-X • TR-P6
• TR-P4 JST-PH 4 3 • 5V
• GND
• DATA • Red
• Black
• White 5 3 15 2
CTR 11 CTR-W11 24 45 CTR-02 Ethernet CTR-04 Ethernet 5 1 5 1 5 1

If the part or component is critical, the team should have spare parts (the recommended amount). Knowing more or less which parts will break more easily is the way to keep track of what matters and you should keep track of failures. The last thing you want is something breaking or malfunctioning and not having a spare part to replace it!

BOM - Bill of Materials

I am of the belief that keeping track of all materials and resources a team has is basically impossible and very time consuming. However, keeping track of the critical components that the project needs to work or are required to do maintenance is essencial for its success. You should keep something like this and update it frequently:

Component/Part Department Mass (g) Amount Section of Project Voltage (V) Power Consumption (W) Link to Purchase Responsible PPU (Price per unit) ($)
DC Motor 5203 Planetary Traction 396 4 TR-05 12 200 amazon.com/… Miriam V. 54
M5 Bolts Traction 5 23 TR 0 0 amazon.com/…. Miriam V. 0.1

Both the Bill of Materials and the resource tracking could be done together. This helps you understand the Power Budget of the project (how much it consumes), the mass budget (how much everything weights) and the finatial budget (how much it costs).